Case Study 1: Vu Condominiums
The following is a brief overview of a past building envelope investigation and remediation done by Lee & de Ridder Architects.

(Left) Condo exterior (Right) Noted details that would be identified as problematic

Identification of thermal bridging at rim joist on the third level

Identification of areas that have excess heat loss.

The addressing of serious concerns such as structure leaks that could lead to escalating future problems.